CAMPBELL SOUP COMPANY
STORK RETORT COOKER INSTALLATION
PDG provided all architectural, structural, site/civil and mechanical/electrical/plumbing design engineering for a new hydrostatic retort cooker furnished by the Stork Corporation of the Netherlands. Design included a mass concrete foundation and support walls for the 110 tall structure as well as a pump/ equipment room, infeed/outfeed connector building, electrical control room, chiller building and cooling water pit. The cooker is currently the largest hydrostatic cooker built by the Stork Corporation.
Reference
Mr. Dan Junge
Campbell Soup Supply Company
(419) 599-6715
|
 |